Magaya Mining · Operation Profile

Amatola

Amatola is one of Magaya Mining’s main processing sites. Construction began in July 2024, and just five months later, in December 2024, its plant processed its first material, bringing reliable, industrial-scale processing closer to the small-scale miners who supply it.

Site photographs

Gallery

Amatola processing plant and site team memberAmatola processing plant
Site team member inspecting Amatola infrastructureSite inspection
Equipment operating at the Amatola siteSite operations
Amatola team conducting a site walkOperational team
Amatola team members on processing infrastructureTeam on site
Group gathered at the Amatola operationPeople of Amatola
Screening and classifying structure against a blue skyScreening plant
Rotating scrubber washing ore at AmatolaOre washing
Scrubber in operation at the Amatola feed areaFeed and scrubbing
Row of agitator drives across the leach tanksLeach tank agitators
Agitator drive and gearbox on the tank walkwayAgitator drive
Magaya Mining team member at work in the Amatola plantOur people
Leach tanks and walkways at AmatolaLeach tanks
Return to the operations map← Back to Operations